Case study · PRAMAC Storage Systems
Complex technology. Fully charged UX
The energy transition is driving intelligent storage systems. Our energy management system is as natural to use as a consumer app.

- Client
- PRAMAC Storage Systems GmbH
(formerly REFU Storage Systems) - Services
- UX/UI design · Architecture
Frontend & backend
Scrum master · Project management - Project period
- 2022 – 2024
- Technologies
- React · Golang · MQTT
Modbus · OCPP · SunSpec
Kubernetes · Azure · AWS
More charging power.
Without a new grid connection.
For the electric fleet in Pfullingen, one charging point was to become four, but the grid connection was not enough. The EV-Boost Box replaces new supply lines with storage and an energy management system that caps load peaks and optimises self-consumption.
Four reasons why the EV-Boost Box is easy to use
Our UX and UI decisions at a glance.
UX · Information architecture The energy transition needs clarity
All energy flows in one picture, details only when they are needed.
- Real-time energy flow from source to consumer
- Expert options kept in the background via progressive disclosure

UX · Navigation Intelligent guidance in the cockpit
A modular tile system leads straight into photovoltaics, storage and charging points.
- Custom illustrations as visual anchors for each area
- One click into each detail view

UI · Data visualisation From measurement to action
The analysis module brings PV generation, grid consumption and storage use together on one timeline.
- Colour-coded layers for direct comparison
- Analyses across different time ranges

UX · Operating concept UX/UI design as a safety anchor
Clear hierarchies make complex control safe and stress-free.
- Plan charging cycles in a calendar view
- The storage state of charge (SoC) always in view

A system that conducts energy
PV, grid, storage and charging points in one modular platform.
The interface in detail
Current status: energy flows, system status and charging points at a glance.


130kWh
Battery capacity in a 20-foot container
88kVA
bidirectional battery inverter
4× 22 kW
AC charging points without a new grid connection
“Being able to work spontaneously, simply and quickly right in the container helped us immensely – thanks to inovex.”